Excellent
This area has excellent mobile coverage with 9 nearby base stations. 4G coverage is widespread across all major networks, ensuring reliable connectivity for calls, data, and messaging.
9 base stations nearby
Operator Coverage
EE
4G-48 dBmexcellent
3G-42 dBmexcellent
2G-58 dBmexcellent
O2
4G-43 dBmexcellent
3G-59 dBmexcellent
2G-44 dBmexcellent
Vodafone
4G-62 dBmexcellent
3G-53 dBmexcellent
2G-61 dBmexcellent
Three
4G-56 dBmexcellent
3G-59 dBmexcellent
2G-54 dBmexcellent
Area Intelligence
Crime Rate
Very High
1364 incidents
Broadband
217 Mbps
Fiber available
Population
High
Density indicator
Elevation
15m
Signal propagation
Air Quality
Moderate
Environmental index
Property Value
£297k
Trend: falling
Aviation & Airspace
Nearest Airport: Manchester (MAN)
69.2km away
69.2km away
Drone Status: PERMITTED
Open airspace for recreational drone use
Open airspace for recreational drone use
Weather & Signal Impact
Weather
Partly cloudy
8.1°C
Signal Impact
None
Rain fade effect
Flood Risk
Low
Infrastructure risk
Nearest Data Centres
Equinix LS1 (Leeds) — 0.8km • Est. latency: 1ms
Equinix LS1 (Leeds)
Tier 3 • 0.8km
ANS Manchester
Tier 3 • 58.1km
Equinix MA5 (Manchester)
Tier 3 • 61.3km
Free WiFi Locations
Mobile Library Library
1.6km • ~6 Mbps
Closest IT & Telecoms Businesses
6 IT & telecoms businesses found within 5km
Argos Telecoms
1.8km
O2 Shop Computer Shop
2.0km
Three Store Telecoms
4.0km
Carphone Warehouse (Shopping Centre) Electronics
2.5km
Tech Repair Hub (Shopping Centre) Electronics
3.8km
Vodafone Store (Shopping Centre) Electronics
3.9km
Nearest Emergency Services
Police Stations
Police HQ
1.7km
Police HQ (Central)
0.4km
Fire Stations
Fire & Rescue Station
3.4km
Fire & Rescue Station (Central)
1.0km
Community Fire Station (North)
1.1km
Mast Planning Applications
Leeds • Approval rate: 40%
New Monopole 20mApproved
CTIL (O2/Vodafone) • 2.13km • Full Planning Permission • Est: £50k
Ref: LEE/2026/4895/TEL
Rooftop AntennaUnder Review
O2 • 0.66km • Prior Approval (Part 16) • Est: £14k
Ref: LEE/2025/8685/TEL
New Monopole 20mApproved
Three • 2.29km • Full Planning Permission • Est: £72k
Ref: LEE/2025/6218/TEL
Equipment SwapPending
Shared Rural Network • 1.34km • Prior Approval (Part 16) • Est: £19k
Ref: LEE/2024/1699/TEL
Macro Tower 25mUnder Review
Vodafone • 2.02km • Full Planning Permission • Est: £106k
Ref: LEE/2024/4972/TEL
Council generally supportive of telecoms infrastructure - good area for coverage expansion
Mast Installation Cost Estimate
Standard Area — Standard area - permitted development rights available for most installations
Small Cell
6-10m
£36,463
Permitted Development • 2-4 months
Rooftop Antenna
Up to 6m above building
£45,596
Permitted Development (under 6m) • 3-6 months
Monopole 20m
15-20m
£83,581
Prior Approval Required • 4-8 months
Lattice Tower 30m
25-30m
£117,009
Prior Approval Required • 6-12 months
Infrastructure Sharing
89% shared
MBNL: 2 • CTIL: 4 • Multi: 2 • Single: 1
High infrastructure sharing - operators collaborate effectively in this area
Mast Regulations & Permitted Development
Permitted Development (prior approval for larger structures)
Standard permitted development rights apply. Most telecoms installations can proceed with prior approval notification rather than full planning permission.
Ground-Based Masts
Up to 30m permitted under Part 16 GPDO 2015 (as amended April 2022)
Prior ApprovalBuilding-Mounted Equipment
Antennas up to 6m above the building are permitted development
Permitted DevelopmentSmall Cells & Street Furniture
Equipment on existing structures (lamp posts, bus shelters) up to 2.5m
Permitted DevelopmentElectronic Communications Code
Operators with ECC rights can negotiate access to land/buildings for equipment installation
Statutory Right (with Code powers)Planning authority: Leeds • Height limits: 30m (ground) / +6m (building-mounted) • Legislation: Part 16, Schedule 2, GPDO 2015 (amended 2022)
Listed Buildings & Conservation Status
88 listed structures
Conservation Zone: No
Moderate - Multiple listed structures may affect planning decisions
Schools, Hospitals & Sensitive Sites
Planning Objection Risk: High - School within 200m increases public objection risk
Schools (5)
Brudenell Primary School - 0m
Alder Tree Primary Academy - 0m
Quarry Mount Primary School - 0m
Hospitals (5)
Leeds General Infirmary - 0m
Woodhouse Health Centre - 0m
Little Woodhouse Hall - 0m
Building Age Profile & Indoor Signal Loss
Dominant Era: Modern (post-1980) • Indoor Signal Loss: 7-12 dB
Generally good signal penetration expected in this area
Fibre Backhaul Availability
Good backhaul rating
5G Ready: Yes
Virgin Media (nexfibre) - Full Fibre • 1.1 Gbps
CityFibre - Full Fibre • 1 Gbps
Openreach FTTC - Part Fibre • 80 Mbps
Leased Line - Dedicated • 10 Gbps
Full fibre backhaul available - area supports 5G small cell deployment
Digital Deprivation Index
66/100 Average Connectivity
Decile 7/10
Average digital connectivity - some residents may face access challenges
Network Congestion Risk
100/100 High Risk
Peak: 07:30-09:30, 17:00-19:00
Stadium / Arena - Match days can cause severe congestion within 1km radius
Major Transport Hub - Rush hour peaks create predictable congestion patterns
Shopping Centre / High Street - Weekend and holiday peaks, especially on 4G data
Event Venue / Conference Centre - Periodic events can overwhelm local capacity
3G Sunset Impact Assessment
3G has been largely phased out. Ensure all devices support 4G VoLTE minimum.
Vodafone
Completed (June 2024)
3G network fully shut down. Only 4G and 5G services active.
EE
In Progress (March 2025)
3G shutdown rolling out by region. Some areas already completed.
Three
In Progress (Late 2025)
3G being phased out to reallocate spectrum to 4G/5G.
O2
Planned (2025-2026)
3G sunset confirmed but timeline varies by region.
Replace 3G-only devices before shutdown completion. Ensure VoLTE is enabled on your handset for voice calls over 4G.
Terrain & Signal Propagation
58/100 Good
Terrain: Coastal
Generally adequate propagation with some localised dead spots possible
Satellite Broadband Alternatives
Terrestrial broadband likely sufficient, but satellite is a viable backup option
Starlink
LEO Constellation • 50-200 Mbps
£75/month + £449 hardware
OneWeb
LEO Constellation • 50-195 Mbps
Enterprise pricing
EE Satellite SOS
Emergency Service • Emergency only
Included with EE plans
Kymeta / Hughes
GEO Satellite • 10-50 Mbps
Enterprise only
Electromagnetic Interference Sources
Overall Risk: Moderate
High Voltage Power Lines (0.9km) - HV lines within 500m can cause interference on lower frequencies
Transport & Rail
Nearest stations:
Leeds (0.7km) Manchester Piccadilly (57.7km) Birmingham New St (149.1km)
Connectivity Score
B
Overall connectivity grade for LS1 1UR
Run Live Analysis
This is a static snapshot. For real-time data with interactive maps, live weather impact, and full network status:
Launch Interactive Analyzer