Mobile Signal Report for LS1 1UR

Leeds • Yorkshire and The Humber

Last updated: 14 March 2026

Excellent

This area has excellent mobile coverage with 9 nearby base stations. 4G coverage is widespread across all major networks, ensuring reliable connectivity for calls, data, and messaging.

9 base stations nearby

Operator Coverage

EE

4G-48 dBmexcellent
3G-42 dBmexcellent
2G-58 dBmexcellent

O2

4G-43 dBmexcellent
3G-59 dBmexcellent
2G-44 dBmexcellent

Vodafone

4G-62 dBmexcellent
3G-53 dBmexcellent
2G-61 dBmexcellent

Three

4G-56 dBmexcellent
3G-59 dBmexcellent
2G-54 dBmexcellent

Area Intelligence

Crime Rate
Very High
1364 incidents
Broadband
217 Mbps
Fiber available
Population
High
Density indicator
Elevation
15m
Signal propagation
Air Quality
Moderate
Environmental index
Property Value
£297k
Trend: falling

Aviation & Airspace

Nearest Airport: Manchester (MAN)
69.2km away
Drone Status: PERMITTED
Open airspace for recreational drone use

Weather & Signal Impact

Weather
Partly cloudy
8.1°C
Signal Impact
None
Rain fade effect
Flood Risk
Low
Infrastructure risk

Nearest Data Centres

Equinix LS1 (Leeds) — 0.8km • Est. latency: 1ms

Equinix LS1 (Leeds)
Tier 3 • 0.8km
ANS Manchester
Tier 3 • 58.1km
Equinix MA5 (Manchester)
Tier 3 • 61.3km

Free WiFi Locations

Mobile Library Library
1.6km • ~6 Mbps

Closest IT & Telecoms Businesses

6 IT & telecoms businesses found within 5km
Argos Telecoms
1.8km
O2 Shop Computer Shop
2.0km
Three Store Telecoms
4.0km
Carphone Warehouse (Shopping Centre) Electronics
2.5km
Tech Repair Hub (Shopping Centre) Electronics
3.8km
Vodafone Store (Shopping Centre) Electronics
3.9km

Nearest Emergency Services

Police Stations

Police HQ
1.7km
Police HQ (Central)
0.4km

Fire Stations

Fire & Rescue Station
3.4km
Fire & Rescue Station (Central)
1.0km
Community Fire Station (North)
1.1km

Mast Planning Applications

Leeds • Approval rate: 40%

New Monopole 20mApproved
CTIL (O2/Vodafone) • 2.13km • Full Planning Permission • Est: £50k
Ref: LEE/2026/4895/TEL
Rooftop AntennaUnder Review
O2 • 0.66km • Prior Approval (Part 16) • Est: £14k
Ref: LEE/2025/8685/TEL
New Monopole 20mApproved
Three • 2.29km • Full Planning Permission • Est: £72k
Ref: LEE/2025/6218/TEL
Equipment SwapPending
Shared Rural Network • 1.34km • Prior Approval (Part 16) • Est: £19k
Ref: LEE/2024/1699/TEL
Macro Tower 25mUnder Review
Vodafone • 2.02km • Full Planning Permission • Est: £106k
Ref: LEE/2024/4972/TEL

Council generally supportive of telecoms infrastructure - good area for coverage expansion

Mast Installation Cost Estimate

Standard Area — Standard area - permitted development rights available for most installations
Small Cell
6-10m
£36,463
Permitted Development • 2-4 months
Rooftop Antenna
Up to 6m above building
£45,596
Permitted Development (under 6m) • 3-6 months
Monopole 20m
15-20m
£83,581
Prior Approval Required • 4-8 months
Lattice Tower 30m
25-30m
£117,009
Prior Approval Required • 6-12 months

Infrastructure Sharing

89% shared
MBNL: 2 • CTIL: 4 • Multi: 2 • Single: 1

High infrastructure sharing - operators collaborate effectively in this area

Mast Regulations & Permitted Development

Permitted Development (prior approval for larger structures)
Standard permitted development rights apply. Most telecoms installations can proceed with prior approval notification rather than full planning permission.
Ground-Based Masts
Up to 30m permitted under Part 16 GPDO 2015 (as amended April 2022)
Prior Approval
Building-Mounted Equipment
Antennas up to 6m above the building are permitted development
Permitted Development
Small Cells & Street Furniture
Equipment on existing structures (lamp posts, bus shelters) up to 2.5m
Permitted Development
Electronic Communications Code
Operators with ECC rights can negotiate access to land/buildings for equipment installation
Statutory Right (with Code powers)
Planning authority: Leeds • Height limits: 30m (ground) / +6m (building-mounted) • Legislation: Part 16, Schedule 2, GPDO 2015 (amended 2022)

Listed Buildings & Conservation Status

88 listed structures
Conservation Zone: No
Moderate - Multiple listed structures may affect planning decisions

Schools, Hospitals & Sensitive Sites

Planning Objection Risk: High - School within 200m increases public objection risk
Schools (5)
Brudenell Primary School - 0m
Alder Tree Primary Academy - 0m
Quarry Mount Primary School - 0m
Hospitals (5)
Leeds General Infirmary - 0m
Woodhouse Health Centre - 0m
Little Woodhouse Hall - 0m

Building Age Profile & Indoor Signal Loss

Dominant Era: Modern (post-1980) • Indoor Signal Loss: 7-12 dB
Generally good signal penetration expected in this area

Fibre Backhaul Availability

Good backhaul rating
5G Ready: Yes
Virgin Media (nexfibre) - Full Fibre • 1.1 Gbps
CityFibre - Full Fibre • 1 Gbps
Openreach FTTC - Part Fibre • 80 Mbps
Leased Line - Dedicated • 10 Gbps
Full fibre backhaul available - area supports 5G small cell deployment

Digital Deprivation Index

66/100 Average Connectivity
Decile 7/10
Average digital connectivity - some residents may face access challenges

Network Congestion Risk

100/100 High Risk
Peak: 07:30-09:30, 17:00-19:00
Stadium / Arena - Match days can cause severe congestion within 1km radius
Major Transport Hub - Rush hour peaks create predictable congestion patterns
Shopping Centre / High Street - Weekend and holiday peaks, especially on 4G data
Event Venue / Conference Centre - Periodic events can overwhelm local capacity

3G Sunset Impact Assessment

3G has been largely phased out. Ensure all devices support 4G VoLTE minimum.
Vodafone
Completed (June 2024)
3G network fully shut down. Only 4G and 5G services active.
EE
In Progress (March 2025)
3G shutdown rolling out by region. Some areas already completed.
Three
In Progress (Late 2025)
3G being phased out to reallocate spectrum to 4G/5G.
O2
Planned (2025-2026)
3G sunset confirmed but timeline varies by region.
Replace 3G-only devices before shutdown completion. Ensure VoLTE is enabled on your handset for voice calls over 4G.

Terrain & Signal Propagation

58/100 Good
Terrain: Coastal
Generally adequate propagation with some localised dead spots possible

Satellite Broadband Alternatives

Terrestrial broadband likely sufficient, but satellite is a viable backup option
Starlink
LEO Constellation • 50-200 Mbps
£75/month + £449 hardware
OneWeb
LEO Constellation • 50-195 Mbps
Enterprise pricing
EE Satellite SOS
Emergency Service • Emergency only
Included with EE plans
Kymeta / Hughes
GEO Satellite • 10-50 Mbps
Enterprise only

Electromagnetic Interference Sources

Overall Risk: Moderate
High Voltage Power Lines (0.9km) - HV lines within 500m can cause interference on lower frequencies

Transport & Rail

Nearest stations:

Leeds (0.7km) Manchester Piccadilly (57.7km) Birmingham New St (149.1km)

Connectivity Score

B

Overall connectivity grade for LS1 1UR